Naar de inhoud
OneKitly

Five Points of Learning Rate Turn Fifty Repetitions Into Four Hundred

Gepubliceerd op 2-10-2026 · 3 min leestijd · Dagelijkse calculators

Aisha Karim

Aisha Karim — Redacteur fitness en hardlopen bij OneKitly

Hardlopen · Training

Getoetst aan 2 bronnen

Profiel bekijken →
Kort gezegd

The learning rate is not a percentage per attempt; it is the fraction of the time that remains each time the number of attempts doubles. At 85 %, the second attempt takes 85 % of the first, the fourth 85 % of the second, and the eighth 85 % of the fourth: 20 minutes becomes 17, then 14.45, then 12.28, then 10.44 at the sixteenth and 8.87 at the thirty-second. Because the improvement arrives per doubling, progress feels fast at the start and nearly stops later — the gap between attempt 1 and 2 is three minutes and the gap between 16 and 32 is a minute and a half, for sixteen times as much work. That shape is also why five points of rate matter so much: reaching an 8-minute target needs 50 attempts at 85 % and 415 at 90 %.

Advertentie

At an 85 % learning rate, a task that takes 20 minutes first time reaches 8 minutes after 50 attempts. At 90 % it needs 415 — the same task, five points apart.

The cumulative total is what a schedule needs

Thirty attempts at this rate add up to 341.8 minutes rather than the 600 that thirty times the first attempt would suggest — learning saves 258 minutes over the batch, and that is the figure to quote when someone asks how long a run of thirty will take. Quoting the final attempt's 9 minutes instead promises a pace nobody reaches until the end, which is how a plan built from the best observed time runs late from the first day. Estimate the batch from the cumulative curve, and the individual attempt only when scheduling the last one.

Where the model stops describing anything

Taken literally, the curve says the time keeps falling forever and eventually reaches zero, which nothing does. Real tasks hit a floor set by the physical minimum — how fast a machine cycles, how long a weld has to cool, how quickly a hand can move — and improvement stops there no matter how many repetitions follow. The model is also silent on forgetting: a gap of six months between attempts undoes part of the gain, and a curve fitted across a long interruption will fit badly. Use it for a continuous run of similar work, and refit it whenever the method, the tooling or the person changes, because each of those starts a new curve rather than continuing the old one.

Time
20 minutes first time, 85 % learning rate
AttemptTime
120.00 min
217.00 min
414.45 min
812.28 min
1610.44 min
328.87 min

Uitgewerkt met onze eigen calculator

Leercurvecalculator

Gegeven

Tijd voor de eerste poging
20
Leerpercentage (%, lager = sneller)
85
Herhalingen om te voorspellen
30
Streeftijd per poging (0 = overslaan)
8

Resultaat

Tijd bij de n-de poging
9,009
Cumulatieve tijd voor n pogingen
341,813
Herhalingen tot de streeftijd
50

Deze cijfers komen uit de calculator hieronder, ze zijn niet met de hand ingetypt — ze worden opnieuw berekend telkens als de tool verandert.

Reken het door met je eigen cijfers →
Advertentie

Veelgestelde vragen

How do I find my own learning rate?
Time the first attempt and a later one whose number is a power of two — the second, the fourth, the eighth — and take the ratio, then the appropriate root. If attempt 8 takes 12.28 minutes against 20 for the first, the total reduction is 0.614 across three doublings, and the cube root of 0.614 is 0.85. Two data points give a rough answer and four give a usable one; below about eight attempts the noise between individual tries is larger than the effect being measured.
Does the same curve describe a person and a factory?
The shape does, and the mechanism does not. For an individual the gain comes from motor skill, familiarity and removing hesitation; for an organisation it comes from better tooling, better sequencing, and the fact that a hundred people each learn a little. Organisational curves usually have lower rates — improvement per doubling is larger — because there are more things left to fix, and they can be reset by turnover in a way an individual curve is not. Fit them separately even when both are running at once, or the personal gain gets credited to the process and the process stops being improved.

Artikelen die je misschien interesseren

Alle gidsen →
UitlegSeventy Per Cent Capacity Is Not Thirty Per Cent Waste7,000 units made against a capacity of 10,000 is 70 % utilisation. The reflex is to call the other 30 % a loss; queueing theory says it is the reason the line still delivers on time.UitlegEfficiencies Multiply, They Never Add33 % at the power station, 95 % on the grid, 88 % in the power supply: the chain delivers 27.6 %, so a 9 W lamp costs 33 W at the source.UitlegA Labour Cost Ratio Means Nothing Until You Say What Is in It$8,000 of wages on $25,000 of revenue is 32 %. Add $1,800 of employer contributions and the same week reads 39.2 % — a seven-point move with no change in staffing.UitlegOutsourcing the Support Desk Raises Revenue per Employee by a Quarter25 million of revenue across 250 people is 100,000 each. Move fifty of them to a supplier and the same revenue reads 125,000 — a 25 % improvement in a productivity measure, with the same work being done.UitlegWhat Is Food Cost Percentage? Portion Drift Beats Supplier PricesA $3.30 plate on a $12.00 menu is 27.5 percent. An extra 30 grams of chicken and 6 percent waste push it to 31.65 percent — while a 5 percent supplier increase moves it only 1.38 points.UitlegProcess Capability: Cp, Cpk and What Six Sigma Actually ClaimsCp compares the spec width to the process spread; Cpk penalises being off-centre. A process can have an excellent Cp and still make scrap — here is the case, with defect rates computed from the normal distribution rather than read off a table.

Vergelijkbare tools

Bronnen

Een fout in dit artikel gezien?