How to Budget a Home Renovation Without a Single Made-Up Number
Published 7/8/2026 · 6 min read · Real-estate calculators
Refuse the single figure and build the budget from the work types you have actually decided on. A mid-range full renovation of a 1,200 square foot flat at $140 per square foot comes to $168,000 before anything unexpected; a light cosmetic refresh of the same space runs $25 to $60 per square foot, and a gut renovation touching structure runs $250 to $400. Roughly half of any of those totals is labour, which is the line that moves most: a 20 percent swing in labour rates alone moves the $168,000 by $16,800. Then add a contingency of 10 to 20 percent — $16,800 to $33,600 here, for a total between $184,800 and $201,600. That contingency is not padding. It is the priced expectation that opening a wall, a floor or a ceiling will reveal something no survey could see through solid material.

There is no honest single figure for a renovation. Build it up by work type, accept that labour is the biggest and least predictable line, and hold 10 to 20 percent back for what the survey could not see.
Why there is no single number, and what to give instead
Two renovations of the same floor area can differ by a factor of ten, because the word covers everything from paint to moving a load-bearing wall. Anyone quoting one number for a renovation is either quoting for a scope they have decided on your behalf, or quoting the number you wanted to hear. The only defensible budget is a list of decisions, each with its own range, added up.
Per unit of area helps only once the depth of work is fixed. On the same $140 per square foot basis, 1,200 square feet is $168,000 — but that figure describes a mid-range full renovation, not a refresh at $25 to $60 and not a gut at $250 to $400. State the depth first, then the area, then the range. A budget that names its scope can be argued with; one that names only a total cannot.
Labour is the dominant line and the volatile one
On most jobs labour is roughly half the total, and on anything involving demolition, chasing or plastering it is more. It is also the line you cannot shop for the way you shop for tiles: a trade's day rate reflects local demand, and in a busy market the good ones are booked and the available ones are available for a reason. On the $168,000 example, half is $84,000, so a 20 percent swing in rates alone moves the total by $16,800 — about 10 percent.
This is why three quotes for the same written scope routinely differ by a third or more, and why a quote far below the others is information rather than a bargain. Compare quotes only when they price the same list of works in the same order of operations; otherwise you are comparing scopes, not prices, and the cheapest one is usually the one that left something out.
The contingency is a line item, not optimism tax
A survey looks at surfaces. It cannot see a rotten joist under a floor, a cracked drain under a slab, wiring that predates the current standard behind sound plaster, or damp that the last owner's paint has been hiding. Those are not rare events; they are the normal outcome of opening an old building, which is why 10 to 20 percent is the right band — nearer 10 on a recent building with a narrow scope, nearer 20 on anything pre-war or structural.
Write it into the budget as its own line, hold it as cash rather than as headroom on a credit line, and treat any of it that survives to the end as a genuine saving. The alternative — discovering the number at week six, with the floor up — is where renovations turn into borrowing decisions made under time pressure, which is the most expensive way to finance anything.
| Work type | Typical range | What drives the spread |
|---|---|---|
| Kitchen, full replacement | $15,000 to $45,000 | Cabinetry and worktop material, and whether the plumbing and gas points move. |
| Bathroom, full replacement | $8,000 to $25,000 | Tiling area, waterproofing, and whether the soil stack stays where it is. |
| Full electrical rewire | $8,000 to $20,000 | Number of circuits and outlets, and whether chasing walls means replastering the whole home. |
| Plumbing replacement | $6,000 to $18,000 | Access to the runs. Pipework in a screed floor or a shared riser costs several times pipework in a stud wall. |
| Windows, whole home | $10,000 to $30,000 | Frame material, glazing spec, and any heritage or co-ownership rule on the external appearance. |
| Insulation and heating upgrade | $12,000 to $35,000 | Internal or external insulation, the heat source chosen, and how much of the cost a public grant absorbs. |
Worked with our own calculator
Renovation cost calculator
Given
- Surface (m²)
- 70
- Your quoted price (/m²)
- $1,000.00
- Contingency (%)
- 10
- Professional fees (%)
- 0
- VAT (%)
- 0
Result
- Works
- $70,000.00
- Total excl. VAT
- $77,000.00
- Total budget incl. VAT
- $77,000.00
These figures are produced by the calculator below, not typed in by hand — they are recomputed whenever the tool changes.
Run it on your own figures →Frequently asked questions
- Will the renovation add its cost back to the value?
- Usually not one for one. Work that removes a defect a buyer would otherwise deduct for — a failing roof, obsolete wiring, a poor energy rating — tends to recover most of its cost. Work that reflects your taste rarely does, and any spend that pushes the home well above the ceiling price of its street recovers least of all. Budget renovations as consumption first and investment second.
- Is it cheaper to do everything at once or in stages?
- All at once is normally cheaper per unit of work, because setting up, protecting and clearing a site is paid once instead of four times, and because trades sequence around each other rather than re-opening finished surfaces. Stages win only when they let you avoid borrowing, which is a financing argument rather than a building one — and the comparison should be made explicitly on those terms.
- How much should the design and permits cost?
- Plan on a professional fee in the region of 8 to 15 percent of the works for a project that needs drawings and site supervision, plus the statutory permit and inspection charges that apply where you are. On the worked example that is a real amount of money, and it is the line most often left out of a first budget — then found again as a surprise in the second.